Lifting, transport and storage specialist Rapid Response Solutions safely moved a 31 tonne electrical transformer from the bed of the trailer and into position at electrical sub-station in Church Crookham. Rapid Response Solutions operations team were using one their 300T Hydra-Slide system to complete the task in a safe and speedy manner, without the use of mobile cranes.